Request for consultation
Thanks for your request. You’ll soon be chatting with a consultant to get the answers you need.
Your form is submitting...
{{formPostErrorMessage.message}} [{{formPostErrorMessage.code}}]
Quick Navigation
PART I: HVA MANAGEMENT.
1. An overview of the sector.
2. Operations Management.
PART II: DESIGN OF HVAS.
3. Concept Development.
4. Interpretation and Presentation.
5. Visitor Management.
6. The Role of Technology.
7. Job Design and Work Organization.
8. Design of the Process and Product Interface.
PART III: IMPROVEMENT.
9. Quality.
10. Productivity.
PART IV: CAPACITY.
11. Managing Demand and Supply.
12. Yield Management.
PART V: OPERATIONS STRATEGY.
13. Risk and Environment.
14. Decision-making.
15. Strategy and Policy.
PART VI: CASE STUDIES.
Rays Farm: A Case Study.
Developing the Concept for the Thackray Medical Museum, Leeds.
Santa Trains at Boness and Kinneil Railway.
Volunteer Management at Nugget Hill: A Case Study.
Visitor Satisfaction Management at Leeds Castle, Kent.
Coventry Museums and Galleries: A Case Study.
Index.
1. An overview of the sector.
2. Operations Management.
PART II: DESIGN OF HVAS.
3. Concept Development.
4. Interpretation and Presentation.
5. Visitor Management.
6. The Role of Technology.
7. Job Design and Work Organization.
8. Design of the Process and Product Interface.
PART III: IMPROVEMENT.
9. Quality.
10. Productivity.
PART IV: CAPACITY.
11. Managing Demand and Supply.
12. Yield Management.
PART V: OPERATIONS STRATEGY.
13. Risk and Environment.
14. Decision-making.
15. Strategy and Policy.
PART VI: CASE STUDIES.
Rays Farm: A Case Study.
Developing the Concept for the Thackray Medical Museum, Leeds.
Santa Trains at Boness and Kinneil Railway.
Volunteer Management at Nugget Hill: A Case Study.
Visitor Satisfaction Management at Leeds Castle, Kent.
Coventry Museums and Galleries: A Case Study.
Index.